Perlite-based wall elements
Elements are assembled dry without mortar or adhesive. Complete room modules are not delivered.
BUILDY CONSTRUCTION
The three BUILDY models have defined specifications. Individual wall elements are assembled on site.
Elements are assembled dry without mortar or adhesive. Complete room modules are not delivered.
Wall specifications, openings and components follow the model design. External walls, load-bearing internal walls and other partitions are defined in the model documentation and specification.
A fixed model does not replace a plot review. Required project planning, structural engineering and technical documentation are clarified before commissioning. Custom redesign is not offered.
A suitable partner builds the model to approved project documentation. System knowledge, responsibilities and availability are checked; construction is quoted separately.